Restricted. Enter the dashboard password to continue.
Every one of these cameras is mounted and cabled. The constraint is downstream — network, fibre, power or a faulty unit — which is why the installed figure runs well ahead of the live figure.
Held on zone, civil and infrastructure readiness. These come online in step with site handover.
Derived from the blocker category on each zone row. As teams reclassify a blocker in the sheet, this forecast moves with it.